Construction design and construction scheme of prefabricated box girder
Ferroelectrics  (IF0.62),  Pub Date : 2021-09-09, DOI: 10.1080/00150193.2021.1905742
Fangfei Dong, Sheng Zhou

Abstract

Construction organization design applicable to China Railway 12 Bureau Group Co., Ltd. Mimeng Railway Kaiyuan beam yard (scope of supply DK54 ∼DK83 000 866) Prefabrication of 270-hole box girders (32 m 237 holes, 24 m (33 holes), Including Kai Dian 1 double-line bridge, Kai Dian 2 double-line super bridge, Kai Dian 3 double-line bridge, Kai Dian 4 double-line bridge, Kai Dian 5 double-line bridge, Nanpanjiang double-line bridge, Lujiang double-line super bridge, Tujia black double-line bridge, Yu San 1 double-line bridge, Yu San 2 double-line bridge, Ya Le double-line bridge, Gan Tangzi super bridge, Longxi dam Lengshuigou double-line super bridge, Yulin Mountain double-line middle bridge, Nandong 1 double-line super bridge, Nandong 2 double-line bridge, Nandong 3 double-line bridge and Nandong 4 double-line bridge.